Drawing review
Confirm the technical configuration and approved scope.
Quality & inspection
Inspection points, documentation and packing requirements can be agreed with the technical scope, so the buyer knows what will be reviewed before the transformer leaves the factory.
Before dispatch, the transformer is checked against the agreed drawings and inspection points. Typical checks cover appearance, connections, protection, oil condition where applicable and packing.
Confirm the technical configuration and approved scope.
Review assembly details and preparation through the production process.
Check the unit against the agreed inspection points and records.
Confirm appearance, accessories, markings and packing condition.
Verify lifting points, securing and shipping marks before dispatch.
Depending on the project and scope, documentation can include approved drawings, inspection records, test reports, packing lists and shipping marks.
Bushings, accessories, lifting points and shipping marks are reviewed before loading so the unit is prepared for the agreed transport route.
Share the project requirements and the checkpoints you need us to include.